CNG Mother Station installed from Gundih pipe line It’s namely “TambakLorok Compressed Natural Gas Plant Project”. Located in TambakLorok, Semarang, Central Java. TambakLorok Compressed Natural Gas Plant Project will receive gas from Gundih Pipe line then gas compressed at pressure of 250 barg and store to Compartment facilities. From Compartment gas will be deliver to Indonesia Power, during peak period (4 – 5 hours everyday).
Compressed Natural Gas –TambakLorok Main process :

  • Gas Separation
  • Gas Dryer
  • Gas Compression system
  • CNG storage
  • Pressure reducing system
  • Gas Heating

Utilities

  • Fuel gas system
  • Compressed air system
  • Closed Drain system
  • Vent System
  • Heat Recovery System
  • Fire water system
  • Cooling water system
  • Water Treatment
  • Power Generator System

The Compressed natural gas – Tambak Lorok new facility consists of Gas Scrubber (V-100), Orifice metering (M-100 A/B), 2 Gas Dryer (D-100 A/B) and (D-200 A/B), CNG Compressor (K-101) until Compressor (K110), CNG Cooler (E-100), CNG Compartment (V-200), CNG Heat Exchanger (E-200)and Station Outlet metering (M-200 A/B) Pre-commissioning for utility such as (Emergency Diesel Genset, Service Waterand Fire Water includedon the Vendor package procedure will be separately).