Pasangkayu, September 24, 2026 — PAMITRA EPC Oil & Gas marked the commencement of the PKO Fraction & Hydrogenation Plant construction project, with a processing capacity of 200 tons per day (TPD), through a Groundbreaking Ceremony held in Pasangkayu on September 24, 2026. The event marked the beginning of the development of an industrial facility designed to process Palm Kernel Oil (PKO) through fractionation and hydrogenation processes. The development of this facility represents a step forward in the advancement of vegetable oil processing infrastructure, with a focus on process reliability, operational efficiency, and product quality. With a processing capacity of 200 TPD, the facility is designed to support industrial requirements through processes that meet established technical specifications and standards.
PAMITRA's Commitment to Integrated Project Execution
For PAMITRA, this groundbreaking ceremony represents more than the commencement of construction. It reflects the company’s commitment to delivering projects through a professional and integrated approach. Every stage of the project, from planning and procurement to construction, prioritizes occupational health and safety (OHS), quality control, timely execution, and effective coordination with all stakeholders. Through strong collaboration and consistent implementation of work standards, PAMITRA strives to ensure that project execution proceeds according to plan, meets technical requirements, and supports the achievement of established project targets. In line with the spirit of “Embracing the Future,” PAMITRA EPC Oil & Gas continues to strengthen its role in delivering professional and reliable Engineering, Procurement, and Construction (EPC) solutions to meet industrial needs. The development of the 200 TPD PKO Fraction & Hydrogenation Plant forms part of PAMITRA’s commitment to supporting the development of efficient and sustainability-oriented industrial facilities.