PAMITRA EPC Oil and Gas continues to demonstrate its strong commitment to upholding the highest standards of safety and quality across its operational activities. This commitment was reaffirmed through a Management Walkthrough (MWT) conducted on September 25, 2026, at Integrated Terminal Pertamina RU VII Kasim in Sorong, West Papua, Indonesia. During the walkthrough, PAMITRA management visited the project site to directly review the progress of the overhaul works on Tanks 5-T-18 and 5-T-24, as well as the repair works on Tank 5-T-01.
Close Supervision to Ensure Quality and Workplace Safety
Through direct on-site inspections, management ensured that every stage of the work was carried out in strict accordance with established Health, Safety, and Environment (HSE) standards, quality requirements, and project schedules. The walkthrough also served as an important opportunity to strengthen coordination and collaboration among field teams, ensuring that all project activities were executed safely, efficiently, on schedule, and with a strong focus on operational reliability. Joko Malis, Site Manager of PAMITRA EPC Oil and Gas at RU VII Kasim, emphasized that safety remains the fundamental priority in overseeing these high-risk projects.
"Through the Management Walkthrough at RU VII Kasim, we ensure that these high-risk projects are carried out safely, with a total of 75,928 safety man-hours achieved across the works on Tanks 5-T-18, 5-T-24, and 5-T-01. To ensure the projects are completed and ready for commissioning on schedule, we prioritize discipline, time efficiency, and a strong work ethic," said Joko Malis.
As an experienced player in the EPC Oil and Gas industry, PAMITRA consistently places safety as its top priority across all projects and operations. Through Management Walkthroughs and the continuous reinforcement of a strong safety culture at project sites, PAMITRA reaffirms its commitment to delivering the highest quality of work while maintaining operational reliability and safeguarding the well-being of all personnel involved.