Strengthening Energy Infrastructure: Jetty II IT Manggis Successfully Enters Commissioning Phase

  • 04 Jul 2026
  • Corporate Communication


KARANGASEM, BALI – PAMITRA EPC Oil and Gas has achieved a significant milestone by reaching the commissioning (functional testing) phase of the Jetty II project at the Manggis Integrated Terminal (IT) in Karangasem, Bali. This stage demonstrates the company's commitment to completing the project on schedule while prioritizing workplace safety (HSSE) and delivering superior quality.


Enhancing Energy Distribution Reliability for Bali and Surrounding Areas

As a vital fuel supply hub for Bali, the operation of Jetty II will significantly increase tanker berthing capacity and improve loading and unloading efficiency.


Functional Testing Leading to Full Operation

The PAMITRA EPC Oil and Gas team is conducting tests covering:


  • Structural & Mechanical: Testing of the jetty structure, loading arms, piping, and mechanical systems.
  • Safety & Automation: Verification of fire suppression systems, instrumentation, and Emergency Shut-Down (ESD) systems.
  • Operational Simulation: Full integration testing prior to handover.


Company Commitment

PAMITRA ensures that all systems operate optimally and safely, adhering to oil and gas industry standards to support national energy security.